Network Installation
2-3
TIWAY I Gateway User Manual
Some
basic procedures to follow when installing a Gateway system include
the following.
•
Be sure you have all components necessary to install the Gateway and
the network cables. (Refer to the checklist below for required parts.)
•
Install the TIW
A
Y I network and host system interface cables (see
Section 2.2). Also refer to the appropriate host system installation
manuals for specific information on cabling between the host and the
Gateway.
•
Install the Gateway in a NEMA panel or other suitable enclosure (see
Chapter 3 for more details).
The items below are required to install the TIW
A
Y I Gateway and to connect
it to a host system and the TIW
A
Y I network.
TIWA
Y I Gateway
L-shaped mounting brackets and bracket screws, or optional rack
mount kit.
Host interface cable (included; PPX:2462553–0003)
Mounting screws (customer
-supplied)
AC power cable (customer
-supplied)
Loopback connector(s) for user
-initiated diagnostic test (included;
PPX:2703834–0001)
TIWA
Y I T
ap Housing (for Local Line installation) (PPX:500–5606)
T
ap cable for use with Local Line (customer
-supplied), or
RS-232-C/423 cable for use with modems (both cables and modems are
customer-supplied)
Basic Installation
Procedures
Requir
ements for
Installing the
Gateway