
4-35
SIMATIC 545/555/575 System Manual
Installing 575 System Hardware
Follow the guidelines and steps below when installing a 575 as system
controller and/or as primary.
NOTE: Read and abide by the warnings and cautions at the beginning of
this section.
1. Ensure that all power is disconnected from the VMEbus base.
2. If the 575 CPU is to perform as the VMEbus system controller, install it
in slot 1.
If the 575 is not performing as the VMEbus system controller, then
install the 575 primary as the leftmost 575 CPU in the system,
according to the “General Guidelines” at the beginning of this section.
3. Install 575 secondary CPUs, if any. (Follow the procedure on page
4-36.)
4. Power up the 575 system.
5. Reconnect the battery after the PCG LED lights up on the 575 system
controller; that is, when the LED on the bottom right-hand side turns
on. See Figure 4-19 for the location of the LEDs.
6. Load your program(s).
No battery backup
Watchdog
System failure
Run
Master on bus
PLC good
575
VME CPU
BAT
RUN
WDG
MOB
SYF
PCG
SERIAL PORT 1
Figure 4-19 Location of the CPU LEDs
Guidelines for
Installing a 575
System Controller
or a Primary 575
Komentáře k této Příručce