Siemens ET 78X Series Provozní pokyny Strana 86

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 349
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 85
DNC Plant/DNC Cell (FBDN1) 05.07
4 NC data management
© Siemens AG 2010 All Rights Reserved
FBDN1/4-78 Motion Control Information System DNC (FBDN) - 04/10 Edition
4.2.3 Uploading NC data
Upload jobs
Upload jobs for serial machines can be tracked in the Properties screen on the
machine. The file currently being uploaded is displayed in the NC Data field.
Download status
The following download states can occur:
Error (e.g. if a COM port is already being used by a different machine)
Inactive (default setting)
Ready (DNC is ready for the upload to be initiated; this status remains set until
the actual upload (from the machine) starts).
Active (uploading data)
Length
The Length field indicates the number of bytes that have been uploaded.
Fig. 4-11: Uploading NC data
Zobrazit stránku 85
1 2 ... 81 82 83 84 85 86 87 88 89 90 91 ... 348 349

Komentáře k této Příručce

Žádné komentáře