Siemens BTC-BR Manuál Strana 186

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 264
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 185
4 Checking and adjusting
4–18 Section 4 © Siemens VDO Trading GmbH TU00-1318-0200302
4.7 Checking and adjusting RPM recording
Fig. 4-17 Inserting adjustment disc / Checking RPM dial for recording
Procedure
Insert
1
the RPM adjustment disc.
The front (6), Abb. 4-18, must point towards the unit cover.
With 1 and 2 driver units close the separating plate (1) and insert the adjust-
ment or
blank chart above the plate.
Close the housing cover.
Connect the unit to the electricity and drive it on the test bench with pulses.
The RPM indicator (5) must point exactly to the marking (4), Abb. 4-17.
Recording (7), Abb. 4-18, must begin between lines (9) and (10)
and end at the adjustment circle (8).
1
2
3
4
5
1 Separating plate 4 Marking
2 Unit cover 5 RPM indicator
3 RPM stylus
1 1900.1501.064.000
Zobrazit stránku 185
1 2 ... 181 182 183 184 185 186 187 188 189 190 191 ... 263 264

Komentáře k této Příručce

Žádné komentáře